Address
6899 Abdullah Al Hamathani Street,     Riyadh, K.S.A 12861

Work Hours
Saturday to Thursday: 10AM - 8PM

Our Services

Project Design

Preparation of design drawings, BOQ, specifications & vendor list including complete load calculations as per project requirements. 

Project design specifications are a set of guidelines and requirements that outline the goals of a project, the intended outcome, and the specific details of how the project should be executed. These specifications typically include information such as the project’s scope, timeline, budget, required resources and deliverables.

Project Execution

A well-executed project involves completing tasks on time, meeting the project budget, and achieving the desired project outcomes. By monitoring progress and making adjustments, project managers can ensure that the project stays on track and meets the expectations of stakeholders.

Our project execution is in the following phases :-

  1. Site/Project survey 
  2. Compliance with the rules & regulations of the government.
  3. Mobilization of resources (technical team, document controller, accounts department, engineering team).
  4. Preparation of the project schedule and PMP schedule.
  5. Preparation of shop drawings and material submittal for approval.
  6. Execution of work as per project schedule.
  7. Monitoring & Reporting of daily work in progress (WIP).
  8. Preparation of Request For Inspection (RFI).
  9. Proceed for inspection as per schedule in stages.
  10. Post installation request for pre Testing & Commissioning.
  11. After project completion request for final Testing & Commissioning.
  12. Preparation of project handover in phases as per schedule.
  13. Preparation of as built drawings, operational maintenance manual and final handover documents.

Testing & Commisioning

Our company offers comprehensive testing and commissioning services for switchgears, transformers, cables, and earthing & lightning equipment. We have the expertise to carry out a wide range of tests, including AC high voltage, insulation resistance, contact resistance, and magnetic curve tests, among others, on switchgears and distribution boards ranging from 230V to 22kV AC and 750V DC. For transformers, we conduct tests such as winding resistance, ratio, AC high voltage, oil, and dissolved gas analyses. Our testing equipment also caters to cables of up to 22kV, with tests such as DC high pressure and AC VLF testing. Additionally, we provide lightning and earth measurements with an Electrical PE endorsement. Our experienced team is dedicated to ensuring that all equipment complies with the required standards and functions correctly.

Learn more about our services

Get a Free Quote, Site Survey and Consultation.